Sequim, WA John Wayne Marina
At every stage of the process, we strive to deliver unsurpassed customer service that exceeds the expectations of our customers. Check out our example below of one project we are proud to share with you. For more information on our products & services, you can read about them here or contact us.
Project Goals
John Wayne Marina 331 Boat Slips located in Sequim, WA use one main utility electric meter to supply the utilities to the building. The customer wanted to bill back the energy utility costs to each boat slip based on how much they individually consume. The request was for a remotely accessible, wireless sub-metering system to meter the electricity usage for each unit.
Scope of Project
- Onsite Consultation, Installation, Commissioning Services, and Meter Installation Training
Schedule
- Equipment Supplied March 2015
- Installation and Commissioning Completed May 2015
Result
Submeter Solutions was contacted by the marina to provide a proposal to replace an existing electric metering system with all new equipment. Â Our solution was able to use the existing Leviton electric meters paired with a new Inovonics wireless meter reading system. Â